Tergi in the Iron and Concrete Coffin. Human Rights Center

Dariali HES is under construction at the Dariali Gorge. They intend to place Tergi River in the derivation channel and tunnel at the distance of eight kilometers. Environmentalists evaluate that construction and operation of the HES in this way will cause irreversible damage to the Dariali Gorge and its eco-system: the gorge landscape changes will be absolute.  The project will make an irreversible impact on the endangered species from the Red Book, such as stream trout, and it will cause a final disappearance of the trout from the Tergi River.