The Trans Anatolian Pipeline (TANAP)


Country: Azerbaijan

Project type: Gas field exploration and pipelines

The Southern Gas Corridor (SGC) is a chain of projects proposed to improve the EU’s energy security by diversifying the natural gas supply to Europe. This is one of the most complex gas exploration and pipelines systems, stretching over 3,500 km and crossing seven countries.  It is comprised of several separate projects with total required investments estimated up to £45 billion.  ADB, AIIB, World Bank, EBRD, and EIB support the Southern Gas Corridor. Despite these projects being promoted as separate, the Southern Gas Corridor developments are closely integrated and have numerous human rights violations.

The Trans Anatolian Pipeline (TANAP)

Description: SOCAR operates the Trans Anatolian Natural Gas Pipeline. The shareholders are SGC (Azerbaijan) with a stake of 58%, BOTAS (Turkey) which holds 30%, and BP (UK) holding the remaining 12%.  The project has a total cost of $8 billion.

The project aims to transport gas from Azerbaijan to Turkey. TANAP project has been supported by different IFIs such as the World Bank ($800 MM ), MIGA ($1.1 B guarantees), EIB ($1.250 B), and AIIB ($600 MM).

It begins its route from the Turkey-Georgia border, passes through Turkey, and feeds into the TAP pipeline at the Turkey-Greece border. The pipeline’s total length is 1,841 kilometers (including 18 km of subsea crossing through the Sea of Marmara). The initial capacity of TANAP will be [1] 16 bcm, from which 6 bcm of gas will be supplied to Turkey and the remaining 10 bcm will be delivered to Europe through the Trans Adriatica Pipeline (see below). The capacity could be raised to 23 bcm/year by 2023 and further to 31 bcm/year by 2026, if additional gas supplies are available from the Shah Deniz field.

Ongoing and Potential Conflict

In Turkey, where TANAP stretched over two thousand kilometers, the project was implemented under a state of emergency conditions, which meant an ongoing crackdown on journalists, civil society, and political opponents.    World Bank project documents for TANAP identified insurmountable gaps in the expected requirements for public consultation, livelihood restoration, human rights, and gender rights, as well as problematic implementation and subsequent compensation by TANAP and its contractors via the Host Government Agreement in Turkey. Therefore, serious concerns and doubts were raised on the impact of the project for people living along the pipeline route, including problems with land compensation, public participation, and freedom of speech.

The project compensated the land loss per national legislation that does not comply with international standards of adequate and full compensation of loss. Several concerns were raised regarding the customary law in the project area that tried to deny women the right to ownership and management of cultivated lands, which was clearly against EIB gender strategy.

The main environmental disruptions were related to biodiversity. A total number of 67 terrestrial and 27 freshwater critical habitats were identified. Nine species among these are considered critically endangered and 14 endangered.  More specifically, natural habitats were affected in many regions of Turkey. This occurred mainly due to the removal of vegetation (typically trees), which was related to the site preparation phase. The pipeline crosses sensitive areas such as Sarikamis Mountains National Park and Saros Environmental Protection Area, protected wetlands (e.g. Lake Manyas that houses many bird species).

Complaints

1)     IFC/MIGA CAO ombudsmen

The complaint, made by a former worker on the South Caucasus Pipeline (SCP), makes allegations of unsafe working conditions and unfair termination, was found eligible by IFC/MIGA CAO ombudsmen in 2017.  The complainant expressed an interest in engaging in a dispute-resolution process convened by CAO. However, the company indicated that firstly, CAO has no jurisdiction over this matter. Secondly, since they had previously held discussions with the complainant on a bilateral basis, they did not want to engage in the CAO dispute resolution process. 

CAO completed the compliance appraisal in March 2018. Through this process, CAO determined that a compliance investigation is not the appropriate response to the complaint. In reaching this conclusion, CAO considered the following:

• the construction work, which is the subject of the complaint, has been completed and ENKA is no longer working on the SCPX project

• the issues raised by the complainant occurred before MIGA providing a guarantee for the project

• available evidence does not suggest that the impacts allegedly constitute a legacy issue of such a serious nature as would require MIGA to refrain from supporting a proposed project based on third-party risk.

2)     Complaint to EIB Compliance Mechanism

Numerous European NGOs submitted a complaint to the EIB’s complaint mechanism, regarding the failure of the European Investment Bank to ensure proper climate impact assessment for Trans Adriatic Pipeline (TAP) and Trans Anatolian Natural Gas Pipeline (TANAP) projects.

According to the complainants, EIB failed to:

1) The EIB failed to require project promoters to provide climate impact assessment for TAP and TANAP projects within their entire area of influence

2) ESIAs failed to include fugitive emissions of greenhouse gases

3) The EIB failed to conduct an accurate greenhouse gasses emission assessment for its loans for the Southern Gas Corridor

4) The project fails to comply with requirements under EIB’s Environmental Standards in the EU and Enlargement Countries and with the provisions of the United Nations Framework Convention on Climate Change

In July 2020, EIB CM issued a report simply dismissing the above concerns, without any additional justifications beyond what EIB contended earlier. The bank’s carbon footprint assessment had not considered the project over its full lifetime; instead, it based its analysis only on the first stage of the project, in which it will transport 10 billion cubic meters of gas annually. However, the EU list of projects of common interest (the so-called 1st PCI List) has also expressed clearly that 10 billion cubic meters annually is a minimum amount of gas that will be imported to the EU thanks to this project. Even the EIB itself does not seem to have any doubts about the project’s capacity: “The infrastructure created could transport larger volumes of gas in the future – at a lower cost than during the initial phase – which would increase the economic benefits of the projects.”

Then, the EIB argued that the project will be entirely climate neutral by making the highly questionable assumption that all the imported gas will be used to replace more polluting sources of energy in Turkey, as well as it is supposed to replace Russian gas from Nord Stream 2 pipeline.   The EIB’s assumptions that the gas from the Southern Gas Corridor will entirely replace other sources of gas are highly hypothetical. In reality, this gas could also delay energy efficiency measures or the expansion of renewable energy sources, which will have to compete with this subsidized gas. In the end, the bank was unable to provide any indication of which EU gas imports will be replaced by the Southern Gas Corridor.